{"id":453,"date":"2020-11-18T22:29:10","date_gmt":"2020-11-18T22:29:10","guid":{"rendered":"https:\/\/www.dands.uk\/rfa\/2020\/11\/18\/8510430lan\/"},"modified":"2026-08-11T14:36:36","modified_gmt":"2026-08-11T14:36:36","slug":"8510430chs","status":"publish","type":"rfaevent","link":"https:\/\/www.dands.uk\/rfa\/rfaevent\/8510430chs\/","title":{"rendered":"8510430chs"},"content":{"rendered":"<p>Race day at Chester. Trains were heavily loaded. Three trains were dispatched under the time interval system. The first came to a stand in the tunnel owing to slippery rails and\/or overloading. The second train hit this train without damage, the third train then hit the second at some speed.<\/p>\n","protected":false},"template":"","class_list":["post-453","rfaevent","type-rfaevent","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.dands.uk\/rfa\/wp-json\/wp\/v2\/rfaevent\/453","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dands.uk\/rfa\/wp-json\/wp\/v2\/rfaevent"}],"about":[{"href":"https:\/\/www.dands.uk\/rfa\/wp-json\/wp\/v2\/types\/rfaevent"}],"wp:attachment":[{"href":"https:\/\/www.dands.uk\/rfa\/wp-json\/wp\/v2\/media?parent=453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}